CONTRACT FLOORING SERVICES BRISTOL

Commercial flooring installation across The South West

CW Jones was founded over 60 years ago and has grown to become one of the largest flooring contractors in the South West

Today the company operates throughout the United Kingdom and holds Constructionline Gold accreditation as well as SMAS and Builders Profile. We work closely with all of the leading manufacturers of floor coverings in the UK and Europe including Altro, Forbo, Interface, Milliken, Gradus and Tarkett to name a few. We retain a pool of fully qualified and accredited installers who carry out the supply and installation of all types of floor coverings including Broadloom Carpet, Carpet Tiles, Vinyl, Linoleum, Rubber, Wood flooring and more

CW Jones have recently and successfully completed new projects for the University of Bath, Hinkley Point C, Aspire Defence at Larkhill, Pegasus Life Retirement Living and many more. We are experienced at meeting the requirements of large scale projects and our contracts team work closely with the project team to meet key programme dates and to resource projects efficiently and effectively.

We hold extensive experience in shop fitting, public house works and repairs for many large companies and national retail outlets including Rolls Royce, Bristol Airport, Bristol Care Homes, Bristol Zoo, Nuffield Health Hospitals, Waitrose and John Lewis to name a few. We have a quick response maintenance team available at short notice to carry out repairs and resolve any flooring issues for our clients


EXPERIENCED

We have a wealth of experience in commercial, retail and local health authorities. From our headquarters in Bristol our installation teams travel to all parts of the country to fulfil contracts for developers, shop fitters, hospital groups, government departments, universities, industrial concerns and individuals.

HIGHLY SKILLED

We undertake any project from 5m2 to 100,000m2 & full time maintenance contracts for large establishments. No job is too large or too small for our efficiently organised installation teams.

COMPETITIVE PRICES

CW Jones has excellent purchasing power enabling us to provide highly competitive prices.
We pride ourselves on our ability to deliver projects on time and within budget.

OUR PROJECTS

CW Jones Commercial Contract: Expert Flooring Solutions at GR8 Space Pegasus Bath Leat
By ALYSON MCKNIGHT 09 Oct, 2024
New build apartments by CW Jones Commercial Contract Team: Expert Flooring Solutions at GR8 Space Pegasus Bath Leat
CW Jones Contract Flooring and the Walcot Yard Project, apartment flooring, Bath UK
By ALYSON MCKNIGHT 23 Sep, 2024
Case study: CW Jones Contract Flooring and the Walcot Yard Project, apartment flooring, Bath UK. New build apartment flooring.
CW Jones, commercial flooring contractors project at Premier Inn, Fox Den Road, Bristol.
By ALYSON MCKNIGHT 25 Aug, 2024
CW Jones, commercial flooring contractors fully managed project at Premier Inn, Fox Den Road, Bristol. Carpet and vinyl flooring fitted.
HPC Workers Campus’  Blog Post thumbnail
By ALYSON MCKNIGHT 17 Mar, 2023
HPC Workers Campus’ at Sedgemoor and Hinkley for Laing O’Rourke Flooring Solutions at HOST Campuses for Hinkley Point C Construction Workers Introduction Welcome to a detailed exploration of the HOST accommodation facilities at Hinkley Point C, a pivotal infrastructure project by EDF Energy, designed to bolster the UK's energy future. This case study dives deep into the world of specialised flooring solutions, showcasing their crucial role in enhancing the functionality and comfort of the living spaces provided for the project's workforce. Overview of the Project: The Hinkley Point C project is not just about constructing a state-of-the-art nuclear power station; it's also about caring for the people who make it all possible. The HOST accommodation facilities, strategically located near the construction site in Bridgwater, serve as a home away from home for the workforce. These facilities are vital for supporting the massive undertaking of building one of the UK's largest energy projects. Objective of the Case Study: The focus here is twofold: to highlight how meticulously chosen flooring solutions have transformed the HOST campuses at Hinkley and Sedgemoor into more than just functional spaces—they're comfortable, inviting homes for the hardworking staff. We’ll explore how these choices not only meet the everyday demands of a busy workforce but also contribute to their overall well-being. Project Context Background Information: Both the Hinkley Campus and Sedgemoor Campus are crucial elements in supporting the mammoth Hinkley Point C project. Nestled close to the bustling construction activity, these campuses are designed with precision to provide not just shelter but a quality living experience. Given the scale and duration of the construction project, high-quality accommodation is not a luxury; it's a necessity. Stakeholders: Key players in this scenario include HOST, the accommodation provider, and a dedicated flooring contractor whose expertise has been pivotal in executing the installation of durable, aesthetically pleasing flooring. Their collaboration ensures that the accommodation not only meets but exceeds the living standards expected in such a significant residential project. Challenges and Objectives Challenges: Designing and implementing flooring solutions for the HOST campuses posed several challenges. The primary concern was durability, crucial in high-traffic areas frequently traversed by construction workers. Maintenance was another significant factor, as the flooring needed to be easy to clean and withstand the rigours of daily use without extensive upkeep. Aesthetics also played a vital role; the environments had to be inviting and comfortable to support the well-being of the workers, enhancing their overall living experience during their stay. Project Objectives: The overarching goals for the flooring project were clear: enhance comfort, ensure durability, and maintain ease of upkeep. The objective was not only to meet the functional requirements of the flooring but also to contribute positively to the living environment. This would help in creating a space where workers could feel at home, restoring and relaxing after demanding construction duties. Solutions Implemented Selection of Materials The choice of materials was critical to the success of the flooring installation. For areas subjected to high traffic, such as hallways and common rooms, robust materials like Karndean Van Gogh vinyl were chosen for their durability and ease of maintenance. In private areas such as bedrooms, softer materials like Corma Primo Ultra carpets were used to provide warmth and comfort underfoot, enhancing the personal spaces of the residents. Design Considerations The design of the flooring had to align with both functional needs and aesthetic desires. Custom features were tailored for communal spaces like restaurants and bars, where the look and feel of the flooring could enhance the atmosphere. Choices were made to complement the interior decor, contributing to an overall sense of cohesion and style throughout the campuses. Installation Process The installation process involved innovative techniques to meet the strict project timelines and maintain quality standards. Efficient planning and execution were crucial, ensuring that flooring installation did not disrupt the ongoing activities at the campuses. The use of advanced installation methods minimised downtime and maximised the effectiveness of the flooring solutions implemented. Results and Benefits Immediate Impact Post-installation, the benefits were immediately observable. The ambience of the campuses improved significantly, with enhanced comfort and a more welcoming environment. Feedback from the residents was overwhelmingly positive, noting the upgraded living conditions and the quality of the materials used. Long-Term Advantages The long-term benefits of the chosen flooring solutions include outstanding durability and minimal maintenance requirements. Durability tests and maintenance records indicate that the flooring is performing well under the conditions expected in such a setting, with residents continuing to express satisfaction with both the functionality and the aesthetic qualities of their living spaces. Conclusion Summary of Outcomes The transformation achieved through the bespoke flooring solutions at the Hinkley and Sedgemoor campuses is remarkable. These solutions have not only met the rigorous demands of a large-scale construction workforce but have also enhanced the quality of living, proving that practical solutions can also be beautifully executed. Future Implications Reflecting on the success of this project, there are valuable lessons to be learned for similar future projects. The effective combination of functionality, durability, and aesthetics in flooring can significantly impact the quality of temporary accommodation in large-scale construction projects, setting a new standard for the industry. Are you planning a project that requires expert flooring solutions? Contact our team today to learn more about how we can bring our expertise and experience to your next project, ensuring results that exceed expectations. Let us help you create functional, attractive, and durable spaces tailored to your needs.
Larkhill For aspire defence Thumbnail
By ALYSON MCKNIGHT 01 Jul, 2020
CW Jones Contract Flooring: A Leader in Commercial Flooring Solutions CW Jones Contract Flooring stands as a preeminent provider in the commercial flooring industry, known for delivering high-quality, durable, and aesthetically pleasing flooring solutions tailored to a wide range of business needs. With over 55 years of experience, CW Jones has built a reputation for excellence, providing bespoke flooring services across various sectors, including educational, healthcare, and industrial environments. Our expertise extends to handling complex projects that require meticulous planning and execution, ensuring that every flooring solution not only meets but exceeds the expectations of our clients. Project Larkhill: Enhancing a Military Legacy Larkhill Garrison, situated on the Salisbury Plain in Wiltshire, England, has long been the headquarters of the Royal School of Artillery and is renowned as a centre of excellence for artillery training with a world-class reputation. The garrison plays a pivotal role in the training and development of artillery personnel, supporting both the strategic needs and operational readiness of the United Kingdom's defence capabilities. In response to the evolving needs of modern military training and accommodations, Larkhill has undergone significant developments under Project Allenby/Connaught (PAC). This ambitious project was designed to upgrade and expand the facilities, ensuring that they continue to meet the high standards required for effective military training and support. During the preparations for PAC, CW Jones was engaged to address the flooring needs throughout the garrison. The project involved extensive collaboration with numerous local and national organisations to ensure that all work undertaken at Larkhill Garrison complied with the strict planning requirements in place, particularly given its proximity to the World Heritage site. This included the successful completion of 30 buildings, among them a new community centre, three workshops, 13 Junior Ranks’ Single Living Accommodation (JRSLA) blocks, seven 8-man houses, two refurbished Junior Ranks’ living blocks, and the refurbished Officers’ mess. The project collectively introduced over 730 new single en-suite bed spaces, significantly enhancing the living and working conditions at the garrison. As CW Jones embarked on this extensive project, our goals were clear: to provide robust, aesthetically pleasing, and functional flooring solutions that would stand the test of time in a demanding military environment. The following sections will detail the specific challenges faced, the strategic solutions implemented, and the successful outcomes achieved in transforming Larkhill Garrison's flooring infrastructure. Project Scope and Objectives Defining the Scope of Project Allenby/Connaught at Larkhill Garrison Project Allenby/Connaught (PAC) represented a significant development initiative aimed at modernising and expanding the infrastructure at Larkhill Garrison. The scope of this project was extensive, involving the construction and refurbishment of numerous buildings to enhance the quality of life for personnel and improve the functionality of training facilities. CW Jones Contract Flooring was tasked with providing flooring solutions across various types of buildings, each with distinct functional and aesthetic requirements. The project encompassed: - New Community Centre: A hub for personnel to gather, requiring a welcoming and durable flooring solution. - Workshops: Areas that demanded highly resilient and safe flooring due to heavy machinery and equipment use. - Junior Ranks’ Single Living Accommodation (JRSLA) Blocks: 13 new blocks needing comfortable yet durable flooring conducive to high traffic. - 8-Man Houses and Refurbished Living Blocks: Residential spaces that required both durability and a homely feel. - Officers’ Mess: A prestigious area needing high-end, visually appealing flooring that reflected its status and usage. Objectives Set Forth by CW Jones Contract Flooring 1. Durability and Maintenance: Ensuring that all flooring solutions installed could withstand the heavy usage typical of a military environment, with minimal maintenance requirements to ease the logistical burden. 2. Aesthetic Integration: Matching flooring options with the interior design specifications for each type of building, enhancing the overall aesthetic appeal while ensuring functionality. 3. Safety and Compliance: All flooring materials had to meet strict safety standards, including slip resistance and fire retardancy, critical in a military setting. 4. Efficient Installation: Managing a streamlined installation process that would align with the overall construction timelines, minimising disruption in the daily operations of the garrison. Navigating Challenges with Strategic Planning Given the location's historical significance and proximity to a World Heritage site, CW Jones also faced the challenge of complying with stringent planning and environmental regulations. This required a careful selection of materials and installation methods that aligned with conservation principles without compromising on the quality or performance of the flooring. In executing PAC, CW Jones was committed to not only meeting but exceeding the set objectives by employing strategic planning, expert knowledge, and coordination with other contractors. This ensured that all flooring installations were performed to the highest standards, within budget, and on schedule, contributing significantly to the project's overall success. The subsequent sections will delve into the specific challenges encountered during the project, the solutions implemented by CW Jones, and the impactful results of these interventions. Challenges and Pain Points Addressing the Unique Demands of a Military Environment The flooring solutions for Larkhill Garrison, under Project Allenby/Connaught, needed to address several specific challenges inherent to a military environment. CW Jones Contract Flooring was tasked with overcoming these obstacles to deliver flooring that was not only practical and durable but also compliant with stringent standards. 1. High Durability and Low Maintenance Requirements The military setting of Larkhill Garrison demanded flooring that could endure high traffic and heavy use without frequent need for repairs or replacement. The challenge was to find materials that combined resilience and ease of maintenance, ensuring longevity even under harsh conditions. Solution: CW Jones selected high-grade, commercial materials known for their durability. Options like reinforced vinyl and premium laminates were chosen for areas subjected to intense use, such as the workshops and JRSLA blocks, providing robust solutions with low maintenance demands. 2. Aesthetic and Functional Requirements Each building within the garrison served a different purpose and thus required a tailored approach to flooring that matched its function and interior design. Solution: For the community centre and officers’ mess, where aesthetics were as crucial as functionality, CW Jones used luxury vinyl tiles and high-quality carpets that offered comfort and style. These choices enhanced the welcoming and prestigious atmosphere of these spaces. 3. Safety Compliance Flooring in military installations must adhere to higher safety standards, including improved slip resistance and fire retardancy, to protect the well-being of all personnel. Solution: All flooring materials were rigorously tested and selected based on their ability to meet military safety certifications. Special attention was given to ensuring that the products installed in corridors and communal areas exceeded slip resistance standards. 4. Efficient and Non-Disruptive Installation The ongoing operations at the garrison required that flooring installation be swift and cause minimal disruption, posing a logistical challenge given the scale and scope of the project. Solution: CW Jones implemented a phased installation plan that allowed for quick and efficient flooring installations during off-peak hours and in a manner that did not interrupt the daily activities of the garrison. Advanced preparation techniques and close coordination with other construction teams ensured the timely completion of each segment. 5. Compliance with Strict Planning and Environmental Regulations Being near a World Heritage site imposed additional regulatory requirements to ensure that all construction activities, including flooring, had minimal environmental impact. Solution: CW Jones worked closely with local and national authorities to ensure all materials and practices adhered to environmental and planning regulations. Sustainable products with low volatile organic compound (VOC) emissions were prioritised to align with these requirements. Through innovative solutions and proactive project management, CW Jones effectively addressed the challenges of providing suitable flooring for Larkhill Garrison. The next section will delve into the specific solutions provided, detailing how each type of flooring was chosen and implemented to meet the project’s diverse needs. Solutions Provided by CW Jones Tailored Flooring Solutions for Diverse Military Needs CW Jones Contract Flooring employed a variety of strategic solutions to meet the unique requirements of each building within the Larkhill Garrison. This section outlines how specific flooring choices were tailored to both functional needs and aesthetic preferences, ensuring the success of Project Allenby/Connaught. 1. Material Selection and Customisation For each type of facility within the garrison, CW Jones selected flooring materials that would best suit its use, traffic levels, and desired ambience. - Community Centre and Officers’ Mess: Luxury vinyl tiles (LVT) and high-quality carpets were installed to provide both luxury and comfort. LVT was chosen for its ability to mimic higher-end materials like hardwood or stone, offering durability without sacrificing style. Carpets provided noise reduction, warmth, and a prestigious look suitable for high-visibility areas. - Workshops: Industrial-grade vinyl and epoxy flooring systems were installed due to their resistance to heavy machinery wear and chemical spills. These materials are not only tough but also offer safety features such as anti-slip textures. - Junior Ranks’ Accommodation and Living Blocks: Engineered wood and heavy-duty carpets were chosen for their durability and ease of maintenance. These materials can withstand frequent cleaning and high foot traffic, crucial for living quarters. - Refurbished Buildings: In areas where existing flooring needed upgrades, CW Jones carefully selected materials that would integrate seamlessly with the new installations, ensuring uniformity and continuity in design across the garrison. 2. Ensuring Safety and Compliance All chosen materials met military specifications for fire resistance, slip resistance, and overall safety. CW Jones worked with manufacturers to ensure that each product not only complied with but exceeded the necessary safety standards. 3. Efficient Installation Techniques CW Jones employed advanced installation techniques that minimised time and disruption: - Phased Approach: The installation was carried out in phases, prioritising buildings based on the garrison’s operational requirements to minimise impact. - Preparation and Logistics: Detailed planning ensured that materials and equipment were available on-site as needed, reducing downtime and potential delays. - Collaboration with Construction Teams: Regular coordination meetings with other contractors ensured that flooring installation was synchronised with other construction activities, streamlining the entire process. 4. Meeting Environmental and Planning Standards CW Jones took extra care to select environmentally friendly materials, particularly important given the proximity to the World Heritage site: - Sustainable Choices: Where possible, materials containing recycled content or those sourced from sustainable production processes were used. - Low VOC Products: Products with low VOC emissions were prioritized to maintain indoor air quality and comply with environmental regulations. By implementing these comprehensive solutions, CW Jones not only met the rigorous demands of a large-scale military installation project but also ensured that the flooring solutions contributed positively to the aesthetics and functionality of each space. The subsequent results and impact, detailed in the next section, demonstrate the effectiveness of these tailored solutions in enhancing the everyday operations and living conditions at Larkhill Garrison. Project Execution Implementing Flooring Solutions Across Larkhill Garrison The successful execution of the flooring solutions for Project Allenby/Connaught at Larkhill Garrison was a testament to CW Jones' expertise in managing complex commercial projects. This section details the phased approach, collaboration efforts, and the effective handling of challenges during the project's implementation. 1. Phased Installation Strategy Given the extensive scope of the project, which included new constructions and refurbishments across multiple buildings, CW Jones employed a phased installation strategy. This approach was crucial for minimising disruption to the ongoing operations of the garrison: - Priority Assignments: Buildings that were critical to the garrison's immediate operational needs were prioritised to ensure that essential functions could continue without interruption. - Sequencing of Work: The installation schedule was carefully sequenced, allowing for simultaneous progress in multiple buildings while avoiding any bottleneck in the supply and deployment of materials and manpower. 2. Coordination with Other Contractors A project of this magnitude required seamless coordination with numerous other contractors involved in the broader construction efforts: - Integration Meetings: Regular meetings were held to coordinate the integration of flooring installation with other construction activities, ensuring that all contractors were aligned with the project timelines and quality standards. - Problem-Solving Sessions: CW Jones facilitated sessions to address any emerging challenges promptly, ensuring solutions were implemented swiftly to maintain project momentum. 3. Overcoming Challenges Several challenges were encountered during the project, including unexpected structural issues in older buildings and tighter-than-anticipated deadlines due to operational demands: - Adaptive Techniques: In response to structural challenges, CW Jones adapted installation techniques, choosing floating floor systems in some areas to accommodate uneven subfloors without extensive preparatory work. - Accelerated Processes: For areas with tight deadlines, accelerated installation processes were employed, such as the use of quick-set adhesives and pre-finished materials that could be used immediately after installation. 4. Quality Assurance and Compliance Checks Throughout the project, CW Jones maintained a stringent focus on quality assurance and compliance: - Regular Inspections: Frequent inspections were conducted to ensure that the installation met both the project specifications and regulatory standards. - Feedback Loops: Channels for feedback were established, allowing for real-time adjustments based on observations from the garrison’s personnel and project managers. 5. Final Handover and Approval The project concluded with a formal handover process, which included: - Completion Audits: Detailed audits of the installed flooring were conducted to ensure every aspect met the agreed specifications. - Approval from Stakeholders: Final approvals were obtained from key stakeholders, including military officials and heritage conservation advisors, ensuring that all parties were satisfied with the outcome. Project Results The execution of the flooring project at Larkhill Garrison resulted in significantly enhanced facilities that supported the daily operations and improved the living conditions of military personnel. The success of this project underlined CW Jones' ability to deliver high-quality flooring solutions in complex and demanding environments. The next section will delve into the results and impact of these flooring solutions, illustrating how they have transformed the functionality and aesthetics of Larkhill Garrison. Results and Impact Transforming Larkhill Garrison with High-Performance Flooring The successful completion of the flooring project at Larkhill Garrison under Project Allenby/Connaught marks a significant enhancement in both the functionality and the living conditions of the facility. This section highlights the tangible impacts and benefits delivered by CW Jones Contract Flooring's solutions. 1. Enhanced Durability and Reduced Maintenance CW Jones's selection of high-durability materials tailored to the demands of a military environment has resulted in a significant reduction in maintenance costs and logistical burdens for the garrison. The new flooring systems are designed to withstand high traffic and heavy use, ensuring longevity and continuous operation without frequent need for repairs. - Long-Term Performance: The materials used, such as reinforced vinyl and heavy-duty carpets, have proven resilient under the rigorous conditions of military use, demonstrating minimal wear and tear over time. - Ease of Maintenance: The chosen flooring solutions are not only robust but also easy to clean and maintain, further reducing the ongoing upkeep costs. 2. Improved Safety and Compliance Safety is paramount in military installations, and the new flooring has contributed significantly to enhancing safety standards across the garrison. Each material was selected with critical safety features in mind, including slip resistance and fire retardancy. - Increased Safety: Incidents related to slips and falls have noticeably decreased due to the superior slip-resistant properties of the installed flooring. - Regulatory Compliance: All flooring installations meet or exceed current safety regulations, providing peace of mind for both the facility managers and the garrison’s occupants. 3. Aesthetic Enhancements and Functional Spaces The aesthetic appeal of the new flooring has transformed the interiors of Larkhill Garrison, creating welcoming and functionally enhanced spaces. This is particularly evident in communal areas like the community centre and the Officers’ mess, where the choice of luxurious materials has uplifted the ambience. - Visual Appeal: The use of high-quality carpets and luxury vinyl tiles has enriched the visual aesthetics, contributing to a more pleasant and comfortable environment. - Functional Improvements: The design and texture of the flooring have improved the acoustics in communal areas, supporting the garrison’s functions by reducing noise levels. 4. Positive Feedback from Garrison Personnel The feedback from military personnel and administrative staff has been overwhelmingly positive, with many noting the improvement in both the environment and their day-to-day operations. - User Satisfaction: Surveys conducted post-installation indicate high levels of satisfaction among the garrison's personnel, who appreciate both the practical and aesthetic improvements to their living and working spaces. - Praise from Leadership: Military leaders at Larkhill have formally commended CW Jones for the quality of work and the positive impact it has had on morale and efficiency. 5. Strengthened Reputation and Future Opportunities The success of this project has not only reinforced CW Jones Contract Flooring's reputation as a leader in commercial flooring solutions but also opened doors for future collaborations on similar military and large-scale infrastructure projects. - Enhanced Portfolio: The Larkhill Garrison project serves as a showcase example in CW Jones's portfolio, demonstrating their capability in handling large, complex projects. - Future Contracts: The visibility and success of this project have led to new opportunities with other military and government installations, further expanding the company’s reach and influence in the sector. The comprehensive approach taken by CW Jones in addressing the unique challenges of the Larkhill Garrison project has set a new standard for excellence in commercial flooring within high-demand environments. The next section will conclude the case study, summarising the key achievements and the broader implications for the future of CW Jones Contract Flooring.
Bellway Homes Tadpole Rise Image
By ALYSON MCKNIGHT 28 Jun, 2020
Supplied and install Forbo Novilon Viva vinyl flooring.
Wapping Wharf Phase 1 for John Sisk and Sons Image
By ALYSON MCKNIGHT 25 Jun, 2020
Umberslade has overall responsibility for the Wapping Wharf regeneration project. It is a family-owned property development company, headed up by director Stuart Hatton and is planning to retain a long-term interest in the project. Community benefits that are part of the Wapping Wharf scheme include: £1.5 million for M Shed, the museum of Bristol; the redevelopment of Museum Square, a public events space by the waterfront; the extension of Museum Street and newly commissioned public art throughout the development.
Wapping Wharf Phase 2 for Balfour Beatty Blog Post Thumbnail
By ALYSON MCKNIGHT 21 Jun, 2020
Breathing fresh life into the historic Harbourside, Wapping Wharf is an exciting new neighbourhood that offers the very best of Bristol living right on your doorstep. Built amongst the city’s up-and-coming independent food, drink and shopping quarter, but also just a short walk to the city centre, Wapping Wharf Living offers you all the best elements of Bristol life, including unparalleled access to the city’s iconic waterfront. With artisan bakers and master baristas, yoga classes and specialist shops, the area is brought to life by a diverse range of retailers.
SS great Britain commercial carpet installation Bristol
By Coby Chetwyn 15 Jun, 2020
Discover how CW Jones expertly replaced the dining saloon carpet on SS Great Britain with bespoke Wilton weave, blending historical integrity with modern luxury.
Show More

CONTACT US TODAY

Contact Us

GET IN TOUCH TODAY
No job is too large or too small for CW Jones!

CWJones Carpet-wood-vinyl Logo
Call Us 01179661454

Come visit us

Mon - Fri
-
Saturday
-
Sunday
Closed

Bank holiday's   Closed


C WJones Carpet & Flooring 

10 Vale Lane, off Hartcliffe Way, Bedminster, Bristol. BS3 5RU

 © 2020 CW Jones Carpet & Flooring  Limited.  Conditions of Sale |  Privacy Policy

Share by: